Our first of two student workdays was with YES Prep North Central campus. The work was a little rough going as the ponds were drier than expected, so dibbles were difficult to manage. However, the students and mentors (Chatt, Glenn, John H., John E.) did manage to get the material planted. Everyone worked well—given that school is almost done for the year!